Retrofit Install Documentation
Pre-Install
Site on arrival (before removing damaged hardware)
Any pre-existing damage to site before removing existing hardware (if applicable)
New hardware packaging
Any damage to new hardware packaging (if applicable)
S/N tag of all new hardware (if applicable)
New hardware turned on prior to install (to confirm no panel damage)
During-Install
Media player location
Modem location
Cable path from media player and modem to screen(s)
Fan location (if applicable)
Outlet locations and any other materials used for power (extension cords or strips)
Photo of mount(s) or locations before displays are installed on them
Post-Install
Full overview of installation (wide angle)
Full over of installation (close up)
Screen(s) edge conditions within framework (if applicable)
Screen(s) edge conditions to each other (if applicable / videowall only)
Video of content playing (5-10 seconds)
Location and photos of employee accessible, buttons, plugs or devices
Location of remote control(s) left onsite
Removal of hardware from site (e-waste disposal)