Retrofit Install Documentation


Pre-Install

  • Site on arrival (before removing damaged hardware)

  • Any pre-existing damage to site before removing existing hardware (if applicable)

  • New hardware packaging

  • Any damage to new  hardware packaging (if applicable)

  • S/N tag of all new  hardware (if applicable)

  • New hardware turned on prior to install (to confirm no panel damage)


During-Install

  • Media player location

  • Modem location

  • Cable path from media player and modem to screen(s)

  • Fan location (if applicable)

  • Outlet locations and any other materials used for power (extension cords or strips)

  • Photo of mount(s) or locations before displays are installed on them


Post-Install

  • Full overview of installation (wide angle)

  • Full over of installation (close up)

  • Screen(s) edge conditions within framework (if applicable)

  • Screen(s) edge conditions to each other (if applicable / videowall only)

  • Video of content playing (5-10 seconds)

  • Location and photos of employee accessible, buttons, plugs or devices

  • Location of remote control(s) left onsite

  • Removal of hardware from site (e-waste disposal)